Yes, yes, I know.
Tumbleweed has been rolling though this blog for ages.
I can plead mitigating circumstances.
Honestly.
Work being done in the real house since February has played havoc with my leisure time. I'm so far behind with just about everything that my little toyshop is now gathering dust.
What I should do is take it out in the garden to work on. In the sunshine. With a glass of chilled Sauvignon Blanc.
Sounds like a plan.......................
Authentic miniature Victorian and Edwardian doll’s dolls, toys, games and playthings for the discerning doll’s house child. Designed and handcrafted by professional artisan Sandra Morris
Friday, 15 June 2007
Friday, 20 April 2007
Palely Loitering.....
Gulp
Yet another month since my last post.
Where does the time go?
Aside from poking my head round the door of my little hobby room to reassure my negelected toyshop that I'm still here, there has been no progress.
That said, we are still in the throes of major refurbishments to the full-size house but I do feel guilty that instead of falling into bed exhausted at the end of each day, I haven't found even the odd 10 minutes to do anything to my shop.
I can't even claim that popping into our local dolls house shop for some wallpaper is progress, except that now I have it, I have no excuse to at get at least the insides of the two front opening doors papered.
But that will have to wait until next month as the next two weeks are absolutely manically, frantically busy.
Yet another month since my last post.
Where does the time go?
Aside from poking my head round the door of my little hobby room to reassure my negelected toyshop that I'm still here, there has been no progress.
That said, we are still in the throes of major refurbishments to the full-size house but I do feel guilty that instead of falling into bed exhausted at the end of each day, I haven't found even the odd 10 minutes to do anything to my shop.
I can't even claim that popping into our local dolls house shop for some wallpaper is progress, except that now I have it, I have no excuse to at get at least the insides of the two front opening doors papered.
But that will have to wait until next month as the next two weeks are absolutely manically, frantically busy.
Saturday, 24 March 2007
Tempis fugit.......
........or to put it another way, time flies.
I can't believe it's a month since my last post. You could be forgiven for thinking that I have made no further progress since this time last month, when I was so buoyed up with success.
Well not strictly true.
Certainly I haven't had as much time as I would have liked to press on with my little toyshop, but we have been having some major renovation works done to the full-size house, which means that everything is in complete disarray and stress levels are sky-high. So many times over the past few weeks I would have given anything to take myself off to potter with the toyshop, but other than sneaking the odd 10 minutes I have resolutely applied myself to life scale problems.
However, this past week, I have managed to progress a little......nothing major to engender whoops of delight, but small tasks have been ticked off the list so it has not been completely neglected.
A few things are being held up because I haven't quite decided what to do. For example, the inside of the two front opening panels. I think that I will use wallpaper to cover the electric tape runs etc. To that end I ordered some sheets of paper from eBay but they are much too small and now that I have them I don't think they're quite the right colour.
Then there's the areas above the display cabinets which will line each of the rooms on the two shop floors. I'd quite like to use a wallpaper border, and again bought some very lovely Victorian children borders, but they are too wide and I can't be bothered to go through the rigmarole of scanning and reducing them, then printing them myself. They never look as good as the originals anyway *sigh*
On the plus side, I have painted the last of the display cabinets and stained all the floorboards inside the shop. I think I will have to varnish them to bring out the colour better and give them a bit of a sheen.
I have also added some further electric tape runs, both inside the shop and on the insides of the door fronts, as I want to install lighting in both the bay windows. This is going to be easier said than done, as I have to run the electricity from the shop interior, to the doors. I think I may have cracked that particular conundrum though, by wiring two plugs to each end of a short length of wire, and putting sockets both inside the shop and inside the door fronts, so that when each end is plugged in, electricity will flow through to the bay windows.
Well that is the theory anyway. I haven't tested the circuits yet, but I have soldered all the joints.
There has also been some minor progress on the exterior. The herringbone brickwork is now finished on the two exterior door fronts, and I have been gradually adding Tudor-style timber beams. I've also fitted two coach lamps either side of the entrance door.
Actually, now that I come to write it all down, these little 10 minute pockets of time all add up. I'll take some photos tomorrow to demonstrate the progress so far.
The next major tasks are
I can't believe it's a month since my last post. You could be forgiven for thinking that I have made no further progress since this time last month, when I was so buoyed up with success.
Well not strictly true.
Certainly I haven't had as much time as I would have liked to press on with my little toyshop, but we have been having some major renovation works done to the full-size house, which means that everything is in complete disarray and stress levels are sky-high. So many times over the past few weeks I would have given anything to take myself off to potter with the toyshop, but other than sneaking the odd 10 minutes I have resolutely applied myself to life scale problems.
However, this past week, I have managed to progress a little......nothing major to engender whoops of delight, but small tasks have been ticked off the list so it has not been completely neglected.
A few things are being held up because I haven't quite decided what to do. For example, the inside of the two front opening panels. I think that I will use wallpaper to cover the electric tape runs etc. To that end I ordered some sheets of paper from eBay but they are much too small and now that I have them I don't think they're quite the right colour.
Then there's the areas above the display cabinets which will line each of the rooms on the two shop floors. I'd quite like to use a wallpaper border, and again bought some very lovely Victorian children borders, but they are too wide and I can't be bothered to go through the rigmarole of scanning and reducing them, then printing them myself. They never look as good as the originals anyway *sigh*
On the plus side, I have painted the last of the display cabinets and stained all the floorboards inside the shop. I think I will have to varnish them to bring out the colour better and give them a bit of a sheen.
I have also added some further electric tape runs, both inside the shop and on the insides of the door fronts, as I want to install lighting in both the bay windows. This is going to be easier said than done, as I have to run the electricity from the shop interior, to the doors. I think I may have cracked that particular conundrum though, by wiring two plugs to each end of a short length of wire, and putting sockets both inside the shop and inside the door fronts, so that when each end is plugged in, electricity will flow through to the bay windows.
Well that is the theory anyway. I haven't tested the circuits yet, but I have soldered all the joints.
There has also been some minor progress on the exterior. The herringbone brickwork is now finished on the two exterior door fronts, and I have been gradually adding Tudor-style timber beams. I've also fitted two coach lamps either side of the entrance door.
Actually, now that I come to write it all down, these little 10 minute pockets of time all add up. I'll take some photos tomorrow to demonstrate the progress so far.
The next major tasks are
- Painting the roof tiles and dormer window roof tiles
- Hinging the opening door panels
- Hinging the attic roof
Friday, 23 February 2007
Don't stop me now.........
.........I'm having such a good time.... I'm having a ball. (with apologies to Queen!)
I have successfully slain the time-wasting displacement activity goblins and have been forging ahead on all fronts.
Multitasking? Ha!
Problem solving? Tish!
Lateral thinking? Pshaw!
I am positively riding the crest of a creative wave and boy does it feel good!
And the reason for this surfeit of joyous declarations???
Well, everything shop-wise is going swimmingly. Yes I'm having the odd wobbly moment when things look like they might start going a bit pear-shaped, but so far, all problems have been successfully, and more importantly, quickly solved.
Since the weekend I have finished constructing the dormer windows, which will sit in the hinged front section of the roof. They are painted and the roofs are tiled. I've even made proper wood-framed windows to put on the front of each dormer. Each mitre cleanly cut and NO MISTAKES.
Yes I know.
I can almost hear the gasps of disbelief.
But I promise you......it's all true.
Moving on......... the tiling of the main part of the roof is continuing smoothly. I am not having a perfectly tiled roof, having decided that as the building is so old, the roof would probably be in need of some work, so I have been 'distressing' lots of tiles but cutting corners off, or slicing ragged, zig-zag slashes into them, to simulate cracked and crazed tiles. I've even put some slipped tiles on a few sections of the roof. Goes against the grain a bit but once I'd done one, the others followed more easily. I'm using little pre-cut cardboard tiles, which are very easy to distress. When the tiling is finished I will paint them in various slate colours, with some green, mouldy bits where the water runs down. I'll be adding little bits of moss, growing out of the holes where the tiles have slipped, as well as clumps of greenery blocking the guttering.
Moving even further on....... I have started the brickwork on the shop door fronts.
I'm using stencils and brick powder supplied by Bromley Craft Products and have decided on a herringbone brick pattern, which I will divide using oak beams to give a Tudor-style effect.
I have used a similar system before, on my Gothic Baronial mansion. It was sold as Magic Stone, and involved sticking a self-adhesive grid all over the area to be covered, then the powder was mixed with water and spread over the grid. When almost dry, the grid was pulled off, leaving the stonework intact, but the grid itself was then thrown away as it was not re-usable.
The system I am using for the toy shop utilises a re-usable stencil, which must be temporarily fixed in place on the wall using a stencil mount spray. After the brickwork compound is spread onto the wall, the stencil is removed, leaving neat bricks with mortar lines in between.
The stencil must then be washed and carefully dried before using again.
I spent ages yesterday trying to decide which was the best place to start and how to achieve the pattern I wanted, but the herringbone is so confusing that in the end I just trusted to luck and started at the bottom and worked my way up, carefully leaving gaps so that I would be able to glue the bay windows in place later.
Here are the results so far......

Pretty good eh?
After I have finished bricking both fronts, and have all the wooden beams in place, I will then distress the brickwork. I want some cracked bricks, and will be painting individual bricks to give some colour variation, rather than just a flat, brand-new brick look. After they're painted they will have to be sealed to protect the finish.
I have successfully slain the time-wasting displacement activity goblins and have been forging ahead on all fronts.
Multitasking? Ha!
Problem solving? Tish!
Lateral thinking? Pshaw!
I am positively riding the crest of a creative wave and boy does it feel good!
And the reason for this surfeit of joyous declarations???
Well, everything shop-wise is going swimmingly. Yes I'm having the odd wobbly moment when things look like they might start going a bit pear-shaped, but so far, all problems have been successfully, and more importantly, quickly solved.
Since the weekend I have finished constructing the dormer windows, which will sit in the hinged front section of the roof. They are painted and the roofs are tiled. I've even made proper wood-framed windows to put on the front of each dormer. Each mitre cleanly cut and NO MISTAKES.
Yes I know.
I can almost hear the gasps of disbelief.
But I promise you......it's all true.
Moving on......... the tiling of the main part of the roof is continuing smoothly. I am not having a perfectly tiled roof, having decided that as the building is so old, the roof would probably be in need of some work, so I have been 'distressing' lots of tiles but cutting corners off, or slicing ragged, zig-zag slashes into them, to simulate cracked and crazed tiles. I've even put some slipped tiles on a few sections of the roof. Goes against the grain a bit but once I'd done one, the others followed more easily. I'm using little pre-cut cardboard tiles, which are very easy to distress. When the tiling is finished I will paint them in various slate colours, with some green, mouldy bits where the water runs down. I'll be adding little bits of moss, growing out of the holes where the tiles have slipped, as well as clumps of greenery blocking the guttering.
Moving even further on....... I have started the brickwork on the shop door fronts.
I'm using stencils and brick powder supplied by Bromley Craft Products and have decided on a herringbone brick pattern, which I will divide using oak beams to give a Tudor-style effect.
I have used a similar system before, on my Gothic Baronial mansion. It was sold as Magic Stone, and involved sticking a self-adhesive grid all over the area to be covered, then the powder was mixed with water and spread over the grid. When almost dry, the grid was pulled off, leaving the stonework intact, but the grid itself was then thrown away as it was not re-usable.
The system I am using for the toy shop utilises a re-usable stencil, which must be temporarily fixed in place on the wall using a stencil mount spray. After the brickwork compound is spread onto the wall, the stencil is removed, leaving neat bricks with mortar lines in between.
The stencil must then be washed and carefully dried before using again.
I spent ages yesterday trying to decide which was the best place to start and how to achieve the pattern I wanted, but the herringbone is so confusing that in the end I just trusted to luck and started at the bottom and worked my way up, carefully leaving gaps so that I would be able to glue the bay windows in place later.
Here are the results so far......

Pretty good eh?After I have finished bricking both fronts, and have all the wooden beams in place, I will then distress the brickwork. I want some cracked bricks, and will be painting individual bricks to give some colour variation, rather than just a flat, brand-new brick look. After they're painted they will have to be sealed to protect the finish.
Wednesday, 21 February 2007
Conundrum........
Hmmm.
I have hit a snag.
Not unforseen but more of a snag than I had anticipated.
Having finished my lovely, big bay windows, which are to grace the front of the shop, I now have to work out how to run electricity from the body of the shop, to the two fronts.
I had a 'Eureka' moment over the weekend which involved running the copper tape right under the door hinges, which I had already checked were conductive. The electric current from both tapes would then flow through the hinges to pick up the tapes on the inside of the door fronts.
However, as the electrically literate among you will already have spotted, there was a rather drastic flaw in an otherwise damn fine plan.
In my enthusiasm to solve the problem, I completely failed to realise that if I carried out my 'hinge experiment' I would effectively short-circuit the entire house. Happily I hadn't actually fitted the hinges so disaster was narrowly averted.
Back to the drawing board then...................
I have hit a snag.
Not unforseen but more of a snag than I had anticipated.
Having finished my lovely, big bay windows, which are to grace the front of the shop, I now have to work out how to run electricity from the body of the shop, to the two fronts.
I had a 'Eureka' moment over the weekend which involved running the copper tape right under the door hinges, which I had already checked were conductive. The electric current from both tapes would then flow through the hinges to pick up the tapes on the inside of the door fronts.
However, as the electrically literate among you will already have spotted, there was a rather drastic flaw in an otherwise damn fine plan.
In my enthusiasm to solve the problem, I completely failed to realise that if I carried out my 'hinge experiment' I would effectively short-circuit the entire house. Happily I hadn't actually fitted the hinges so disaster was narrowly averted.
Back to the drawing board then...................
Tuesday, 20 February 2007
Pottering.........
Fired up by my success over the weekend, I have managed to squeeze in a few odd hours out of my working week to crack on with the toy shop.
The rest of the wooden flooring arrived this morning so I have managed to finish the first and second floors. I've also completed the construction of the bay windows, and finished the glazing.
The next major step is marking out the fronts, ready for the brick stencilling. I keep changing my mind about the layout which isn't helpful, but I need to have it all carefully planned before moving forward otherwise I will get in a terrible muddle and have to start again.
I almost wish I hadn't decided to have a herringbone brick finish......all those angles :-(
The rest of the wooden flooring arrived this morning so I have managed to finish the first and second floors. I've also completed the construction of the bay windows, and finished the glazing.
The next major step is marking out the fronts, ready for the brick stencilling. I keep changing my mind about the layout which isn't helpful, but I need to have it all carefully planned before moving forward otherwise I will get in a terrible muddle and have to start again.
I almost wish I hadn't decided to have a herringbone brick finish......all those angles :-(
Sunday, 18 February 2007
The tedium of the long distance painter......
Am I glad THAT'S over?!
I knew that painting all of the display units would take a while, but ALL DAY?!
Ready to return to the fray this morning, I surveyed the large pile of display units, and my small sample pot of paint, and decided to go straight to the DIY store to purchase another.
Of course, as I had hinted at yesterday, the lovely deep crimson red is no longer available, so I had to resort to plan B and choose the nearest match.
Back home and I settled down to paint the units, a task which I estimated would take around 2-3 hours.
Hah!
6 hours later I wearily laid down my brushes and practically crawled downstairs on my hands and knees in search of liquid refreshment. Happily however, I did manage to paint every unit using the contents of my original sample paint pot, although it was touch and go towards the end.
I did get into a sort of mindless rhythm, painting the insides first, then sides, top and fronts, but it was tedious, tedious work. My only compensation was that they would only need one coat of paint. I intend to pick out the dentil mouldings and fancy fronts with some gold Rub'N'Buff so that they look gilded. Might get onto that tomorrow.
I had hoped to get started on marking up the front sections of the shop today, drawing out the brickwork plan directly onto the fronts. However after my marathon painting session I thought better of it.
Still.........all in all..........a very productive weekend and I really feel I'm getting somewhere.
Time permitting during the following week I will
I knew that painting all of the display units would take a while, but ALL DAY?!
Ready to return to the fray this morning, I surveyed the large pile of display units, and my small sample pot of paint, and decided to go straight to the DIY store to purchase another.
Of course, as I had hinted at yesterday, the lovely deep crimson red is no longer available, so I had to resort to plan B and choose the nearest match.
Back home and I settled down to paint the units, a task which I estimated would take around 2-3 hours.
Hah!
6 hours later I wearily laid down my brushes and practically crawled downstairs on my hands and knees in search of liquid refreshment. Happily however, I did manage to paint every unit using the contents of my original sample paint pot, although it was touch and go towards the end.
I did get into a sort of mindless rhythm, painting the insides first, then sides, top and fronts, but it was tedious, tedious work. My only compensation was that they would only need one coat of paint. I intend to pick out the dentil mouldings and fancy fronts with some gold Rub'N'Buff so that they look gilded. Might get onto that tomorrow.
I had hoped to get started on marking up the front sections of the shop today, drawing out the brickwork plan directly onto the fronts. However after my marathon painting session I thought better of it.
Still.........all in all..........a very productive weekend and I really feel I'm getting somewhere.
Time permitting during the following week I will
- Assemble the two dormer windows for the attic rooms
- Mark out the brickwork sections on the shop fronts
- Begin tiling the roof
Subscribe to:
Posts (Atom)